Flat roof sensor setup
Step 1: Power Check
- Sensors are shipped with the power ON by default.
- If off, follow this guide to switch them on.
Step 2: Select Installation Location
- Locations should be determined before installation. Follow sensor placements from the blueprint.
Step 3: Prepare the Insulation
- Cut a circular hole with a diameter of 11–12cm into the insulation layer. This opening is slightly larger than the sensor, making it easy to position.
Step 4: Register the sensor.
- Scan the QR code and follow the on-screen instructions to complete registration.

Step 5: Place the Sensor
- Position the sensor within the prepared hole on the water proofing membrane and beneath the insulation.
Step 6: Cover with Insulation
- Place the insulation layer over the installed sensor.

Please note:
- The sensor should never be exposed directly to rain and shall be covered immediately upon installation